removed nonexisting files from manifest
[rrdtool.git] / doc / rrdgraph_graph.src
index 5b163d4..d9b2d9c 100644 (file)
@@ -1,10 +1,10 @@
 =include name
 
-=head1 SYNOPSYS
+=head1 SYNOPSIS
 
 =over 4
 
-=item B<to be depriciated commands>
+=item B<to be deprecated commands>
 
 =over 4
 
@@ -62,7 +62,7 @@ Similarly no report is generated if you don't use print options.
 
 =item B<PRINT> : I<vname> : I<CF> : I<format>
 
-I<Depriciated. Use the new form of this command in new scripts.>
+I<Deprecated. Use the new form of this command in new scripts.>
 The first form of this command is to be used with B<CDEF> I<vname>s.
 
 =item B<PRINT> : I<vname> : I<format>
@@ -85,15 +85,16 @@ B<%%> just prints a literal '%' character
 
 =item *
 
-B<%#.#le> (where # is an optional number) prints like 1.2346e+04
+B<%#.#le> prints like 1.2346e+04. Optional numbers # are field width and
+decimal precision
 
 =item *
 
-B<%#.#lf> prints like 12345.6789
+B<%#.#lf> prints like 12345.6789, with optional field width and precision
 
 =item *
 
-B<%s> place this after B<%le> or B<%lf>.  This will be replaced by the
+B<%s> place this after B<%le>, B<%lf> or B<%lg>. This will be replaced by the
 appropriate SI magnitude unit and the value will be scaled
 accordingly (123456 -> 123.456 k)
 
@@ -145,8 +146,8 @@ B<%c, %x, %X> date+time, date, time
 
 =item *
 
-B<%U, %W> week number of the current year with either the first sunday or
-the first monday determining the first week
+B<%U, %W> week number of the current year with either the first Sunday or
+the first Monday determining the first week
 
 =item *
 
@@ -162,7 +163,7 @@ B<%Z> time zone
 
 =item B<GPRINT> : I<vname> : I<CF> : I<format>
 
-I<Depriciated. Use the new form of this command in new scripts.>
+I<Deprecated. Use the new form of this command in new scripts.>
 This is the same as C<PRINT> but now it is printed inside the graph.
 
 =item B<GPRINT> : I<vname> : I<format>
@@ -207,7 +208,7 @@ also be filled.
 
 =item B<STACK> : I<vname> # I<color> [ :I<legend> ]
 
-I<Depriciated.  Use the B<STACK> modifiers on the other commands.>
+I<Deprecated.  Use the B<STACK> modifiers on the other commands.>
 I<Note: the comments on stacking are still valid...>
 Repeats the last B<LINEx> or B<AREA> however it doesn't start at the
 x-axis but rather on top of the previous element. This implies that
@@ -256,7 +257,7 @@ offset of S<( 7*24*60*60 = ) 604800 seconds> to "look back" one
 week. Make sure to notify the viewer you did so...
 The offset will be valid until the next B<SHIFT> command, which
 can have an offset of zero to restore normal graphing.
-As with the other grapher elements, you can specify a number or
+As with the other graphing elements, you can specify a number or
 a variable here.
 
 =back